£5
I want this!

A Level Planner - Notion Template

£5

Organise your notes, tasks, revision cards and practice questions in the ultimate all-in-one digital workspace. This template has been designed specifically for A Level students and includes:

- Subject Hubs

- Task Tracker

- Notes Tracker (including Cornell Method template)

- Revision Card Template

- Revision Timetable

- Practice Question Tracker

- Notion Guide

- Evidence-based Revision Tips

- All features automatically link to the relevant subject page.


Do you have an increasing workload and want to stay on top of your subjects? Do you want to get organised with revision? Do you want to keep track of what you learn from past papers in preparation for exams? If so, this template is for you!


What is Notion?

Notion is a digital workspace and growing tool for capturing notes, managing tasks and staying organised. The platform is easy to use and can be personalised to suit you! Information is organised into ‘blocks’ and arranged on ‘pages’ - the layouts are up to you.


How does it work?

1. Purchase the template

2. Download the pdf to access a link to the template

3. Follow the instructions provided to duplicate the template to your own Notion

4. Personalise and update as you like!

Please Note:

- This is a digital download. No physical items will be sent after purchase

- This template can only be used with the Notion


Please feel free to reach out with any questions. I’d love to hear from you :)


[Notion Templates | Student Planner | A Level Planner | Revision Planner | Notion Students | Digital Template | Academic Notion | College Planner | Notion Revision | Student Template ]

I want this!

A fully customisable Notion template

Powered by